Skip to content

Bi-directional wireless power flow for medium duty vehicle grid connectivity

This DOE 20kW bidirectional wireless-charging truck used WIZnet Ethernet and industrial WiFi bridges to carry vehicle BMS status between two power-control DSPs

matthew

Published July 27, 2026

Original author: Omer Onar Oak Ridge National Laboratory · United States of AmericaOriginal source (new tab)

Bi-directional wireless power flow for medium duty vehicle grid connectivity

Project description

20 kW Bidirectional Wireless Charging for a Medium-Duty Truck: A WIZnet-Connected Ground-to-Vehicle DSP Network Summary A U.S. DOE–funded consortium led by CALSTART and ORNL integrated 20 kW bidirectional wireless charging into a medium-duty delivery truck. SPI-connected WIZnet Ethernet modules linked the ground- and vehicle-side DSPs to industrial Wi-Fi bridges, carrying vehicle battery status across the charging air gap. Overview The project developed a high-power bidirectional wireless power-transfer system for Class 5 and Class 6 medium-duty plug-in hybrid delivery trucks. Its objectives…

Keep reading with a free account

Guests can read 15 projects per visit. Log in or create a free account to read the full description, open the documents and join the comments.